38,000 ft2

Square footage

$22,500

Project cost

Opportunity

Springfield Local School District engaged Brewer-Garrett to provide commissioning services, including:

  • Monitoring construction to ensure equipment, materials, and workmanship are as shown on drawings and specifications
  • Confirming that equipment and materials perform to designed performance levels in all modes and situations

Solution

Throughout the construction process, our experienced team performed site visits, participated in pre-install meetings, and reviewed drawings and specifications. We also performed functional testing and documentation of equipment operations.

Results

We ensured that the project resulted in an energy efficient building that met the owner’s requirements and expectations, while also performing as designed.